| 000 | 00000cam a2200000 a 4500 |
|---|
| 001 | 26349 |
|---|
| 002 | 1 |
|---|
| 004 | 36471 |
|---|
| 005 | 202104270848 |
|---|
| 008 | 121025s1996 nyu eng |
|---|
| 009 | 1 0 |
|---|
| 020 | [ ] |a 9780824797157 |
|---|
| 035 | [ ] |a 34473705 |
|---|
| 035 | [# #] |a 34473705 |
|---|
| 039 | [ ] |a 20241209115918 |b idtocn |c 20210427084811 |d anhpt |y 20121025145002 |z svtt |
|---|
| 041 | [0 ] |a eng |
|---|
| 044 | [ ] |a nyu |
|---|
| 082 | [0 4] |a 658.4 |2 20 |b BEN |
|---|
| 100 | [1 ] |a Bent, James A. |
|---|
| 245 | [1 0] |a Effective project management through applied cost and schedule control / |c James A. Bent, Kenneth K. Humphreys. |
|---|
| 260 | [ ] |a New York : |b M. Dekker, |c 1996 |
|---|
| 300 | [ ] |a xvi, 456 p. : |b ill. ; |c 29 cm. |
|---|
| 490 | [1 ] |a Cost engineering ; |
|---|
| 500 | [ ] |a Includes index. |
|---|
| 650 | [0 0] |a Project management |
|---|
| 650 | [0 0] |a Cost control |
|---|
| 650 | [0 0] |a Production scheduling |
|---|
| 650 | [0 0] |a Engineering economy |
|---|
| 650 | [1 7] |a Quản lí dự án |x Sản xuất |x Kế hoạch |2 TVĐHHN. |
|---|
| 653 | [0 ] |a Project management |
|---|
| 653 | [0 ] |a Quản lí dự án |
|---|
| 653 | [0 ] |a Production scheduling |
|---|
| 653 | [0 ] |a Kiểm soát chi phí |
|---|
| 653 | [0 ] |a Kế hoạch |
|---|
| 653 | [0 ] |a Sản xuất |
|---|
| 653 | [0 ] |a Engineering economy |
|---|
| 700 | [1 ] |a Bent, James A., |d 1931- |
|---|
| 700 | [1 ] |a Humphreys, Kenneth King. |
|---|
| 852 | [ ] |a 100 |b TK_Tiếng Anh-AN |j (1): 000068046 |
|---|
| 890 | [ ] |a 1 |b 1 |c 0 |d 0 |
|---|